Scale Inhibitor Supply & Installation
Project Overview
The property had an existing domestic water supply system with copper pipework and plumbing fittings. The existing installation was inspected before the existing water treatment component was removed and a new Liff scale inhibitor was installed into the water supply pipework.
The installation was completed carefully within the existing pipework arrangement. The system was then tested to confirm that all connections were secure, operational, and watertight.
Scope of Work
The Installation
For this project, the existing pipework configuration was retained where suitable, allowing the new scale inhibitor to be incorporated into the domestic water supply without unnecessary alterations.
Particular attention was given to the existing copper pipework and surrounding connections due to the age and condition of the installation. Once the new unit had been fitted, the water supply was restored and the pipework was thoroughly checked for leaks.
Outcome
Following installation, the system was tested and all relevant connections were inspected for leaks. The completed installation was confirmed to be secure, operational, and watertight.
Need a Scale Inhibitor Installed in Hanwell?
We can assist with scale inhibitor installation, water treatment components, copper pipework repairs, isolation valve replacements, leaking pipes, and general plumbing maintenance.